Instrumentation report

Degree of parallelism: 80
Wallclock time: 1h 24m 39.00s (5,079.00s)
Available compute time: 112h 52m 0.22s (406,320.22s)
Time running jobs: 17h 22m 53.05s (62,573.05s)
Parallel utilization: 15.400%